From the article that was posted earlier, I believe the FO was saying that they'd be done in June/July.
They were covered in nails, construction material, clothes and hair weaves when I was up there last week.
I had to use 291 as an alternate to 95 earlier this month. Structurally, they looked complete, but there was no signage or striping yet.
As far as I can tell the project hasn't been delayed and is scheduled to be done in early August. I don't have a solid date they are set to open though.
They have traffic lights (single light) at the exit from the ramp nearest to B&S. But no signage yet on 95.